TEMCO 6000 project · Colònia Güell
Lift pit waterproofing in Colònia Güell
Controlled resin injection, joint and junction repairs, followed by a two-component flexible mortar coating on the pit walls and floor.

Intervention stages
The pit accumulated water and needed treatment on the walls and their junctions with the base. The intervention was adapted to the properties of the existing concrete.
Resin injection was performed in a controlled manner. Joints, cracks and other discontinuities were then opened and prepared for sealing with repair mortars.
The treatment was completed with two-component flexible mortar on the walls and floor. The photographs document the initial condition, injection and coating of the same pit.
Each building needs its own assessment. This case study describes work carried out on one specific project.